100 m glass roof construction over busterminal

Under the direction of “Landskapslaget”, the designers of HMG iNFRA was given the opportunity to influence the design and technical solution for the translucent section of the bus terminal roof in Täby Centrum.

Hammerglass panels installed using steel L-profiles at the joins, as well as clamping profiles to ensure watertight joins. The panels are held in place using specially-manufactured fixpoints to prevent sagging between the L-profiles. Each panel measures 2x5.5 metres and is fixed at a 70 degree angle to the upright. Before the panels were cut, each space was measured individually. The panels were then cut out as parallel trapezoids. Total area 5.5x100 metres.

The shatterproof guardrail with opal illuminated Hammerglass panels forms an effective barrier between travelers and incoming buses. The gates leading to the boarding area are equipped with sliding doors made of screen-printed Hammerglass.

2016

HMG iNFRA/

Hammerglass AB

System
Hammerglass Opal 12 mm
Hammerglass L-profile
Hammerglass Fixpoint

Customer
Täby Municipality via NCC

Performance
Landskapslaget/NCC

iNFRA PROJECTS